• Owner:
    Royaa Holding
  • Project Date:
    2014-03-01
  • Projects Period:
    8 Months

Telal North Coast Resort

The project was executed on a large scale, with significant achievements in structured cabling works:

  • Total number of Cat 6 data points: Approximately 12,000 points.
  • Total length of Cat 6 cables pulled: Around 180 kilometers.
  • Number of racks installed and organized: 650 racks, professionally mounted and cable-managed across multiple locations.
  • Pull and lay UTP data cables in accordance with project shop drawings and standards.
  • Perform UTP terminations inside outlets and panels following industry best practices.
  • Conduct Fluke testing for data cables and provide comprehensive documentation and certification.