
-
Owner:
-
Project Date:
2015-05-06
-
Projects Period:
8 Months
Telal El-Sokhna Resort
The project was executed on a large scale, with significant achievements in structured cabling works:
- ✅ Total number of Cat 6 data points: Approximately 22000 points.
- ✅ Total length of Cat 6 cables pulled: Around 330 kilometers.
- ✅ Number of racks installed and organized: 975 rack, professionally mounted and cable-managed across multiple locations.