slider photo
  • Owner:
    Royaa Holding
  • Project Date:
    2015-05-06
  • Projects Period:
    8 Months

Telal El-Sokhna Resort

The project was executed on a large scale, with significant achievements in structured cabling works:

  • Total number of Cat 6 data points: Approximately 22000 points.
  • Total length of Cat 6 cables pulled: Around 330 kilometers.
  • Number of racks installed and organized: 975 rack, professionally mounted and cable-managed across multiple locations.

Projects Gallery